Elkay EDFPVR217RC Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Kable kompozytowe wideo Elkay EDFPVR217RC. Elkay EDFPVR217RC User's Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 5
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
98409C (Rev. B - 9/08)
EDFPVR217RC
Installation/Care/Use manual
Non-Refrigerated Composite VR Fountain
with Back Panel
To assure you install this model easily and correctly, PLEASE
READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING
THE INSTALLATION. CHECK YOUR INSTALLATION FOR
COMPLIANCE WITH PLUMBING, ELECTRICAL AND OTHER
APPLICABLE CODES. After installation, leave these instruc-
tions inside the fountain for future reference.
IMPORTANT! INSTALLER PLEASE NOTE.
THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO
WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY
OCCUR AWAY FROM THE BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK
INTO A FOUNTAIN, CREATING AN ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN
INCREASE IN THE METAL CONTENT OF THE WATER. THIS CONDITION IS AVOIDABLE BY USING
THE PROPER MATERIALS AS INDICATED. ANY DRAIN FITTINGS PROVIDED BY THE INSTALLER
SHOULD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING
PLUMBING SYSTEM.
IMPORTANT
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
Installer
Przeglądanie stron 0
1 2 3 4 5

Podsumowanie treści

Strona 1 - Installation/Care/Use manual

98409C (Rev. B - 9/08)EDFPVR217RCInstallation/Care/Use manualNon-Refrigerated Composite VR Fountain with Back PanelTo assure you install this model ea

Strona 2 - COMPOSITE BACK PANEL

98409C (Rev. B - 9/08)EDFPVR217RC5/8"16mm13 7/8"352mm18 3/16"462mm2 1/4"57mm2 1/4"57mm27"686mmADAREQUIREMENT7 1/8"1

Strona 3 - INSTALLATION INSTRUCTIONS

98409C (Rev. B - 9/08)EDFPVR217RCPAGE 31. Wall should already be framed for the fountain using the positioning dimensions shown in Fig. 2. Shown

Strona 4 - EDFPVR217RC

98409C (Rev. B - 9/08)EDFPVR217RCFIG. 38129BASIN31415610SEE FIG. 7TOP VIEW17181212, 4, 201611 5, 7SEE FIG. 313FIG. 4PAGE 42225 23

Strona 5

98409C (Rev. B - 9/08)EDFPVR217RCFIG. 6FIG. 5PAGE 5Orifice Assy: Mineral deposits on orifice can cause water flow to spurt or not regulate. Mineral d

Komentarze do niniejszej Instrukcji

Brak uwag